Oil & Hazardous Material Transfer System


Equipment Requirements

Component Last Test Date Next Test Date Frequency Requirement Documentation

Piping System Test

08/19/20 08/19/21 Annually 33 CFR 156.170 (c)(4) PDF

Transfer Hoses

08/19/20 08/19/21 Annually 33 CFR 156.170 Page
Emergency Shutdown 07/24/20 07/24/21 Annually 33 CFR 156.170 (c)(5) Page

General Records

Type of Record Effective Date Requirement Documentation
Letter of Intent 05/01/19 33 CFR 154.740 (a) PDF
FRP Approval Letter 02/03/20 33 CFR 154.1060 PDF
FRP Amendment Approval Letters None Current 33 CFR 154.1060
Person in Charge List 04/23/20 33 CFR 154.740 (b) PDF
Person in Charge Training Records See Certificates 33 CFR 154.740 (b) Page
COTP Examinations Maintained for 3 Years 33 CFR 154.740 (e) Page
Declaration of Inspections Maintained for 30 days 33 CFR 154.740 (f) Page
Fire Extinguisher Test 11/19 33 CFR 154.735 (d) PDF
Intrinsically Safe Radio 2016 33 CFR 154.735 (q) PDF
Petroleum Crude Oil CHRIS Manual Code / OIL 06/1999 USCG CHRIS Manual PDF
Petroleum Crude Oil SDS 04/14 EnLink SDS PDF

This records page is maintained by BSI Corp. Inquiries or navigation problems should be directed to Danny Phillips at [email protected]

EnLink Bells Run Home Page

Copyright © BSI Corp - Website Development AlpineWeb Design