Oil & Hazardous Material Transfer System


Equipment Requirements

Component Last Test Date Next Test Date Frequency Requirement Documentation

Piping System Test

08/09/23 08/09/24 Annually 33 CFR 156.170 (c)(4) PDF

Transfer Hoses

08/09/23 08/09/24 Annually 33 CFR 156.170 PDF
Emergency Shutdown 07/23 07/24 Annually 33 CFR 156.170 (c)(5) Page
Loop Tests 2023 2024 Annually 33 CFR 156 PDF

General Records

Type of Record Effective Date Requirement Documentation
Letter of Intent 05/01/19 33 CFR 154.740 (a) PDF
FRP Approval Letter 10/29/2021 33 CFR 154.1060 PDF
FRP Amendment Approval Letters 09/17/21 33 CFR 154.1060 PDF
Person in Charge List 03/23/22 33 CFR 154.740 (b) PDF
Person in Charge Training Records See Certificates 33 CFR 154.740 (b) Page
COTP Examinations Maintained for 3 Years 33 CFR 154.740 (e) Page
Declaration of Inspections Maintained for 30 days 33 CFR 154.740 (f) Copies of DOIs are maintained at the faciltiy dock office
24 Hour Pre-Startup Checklist Maintained for 30 days Copies of Pre-Startup Checklists are maintained at the facility dock office
Fire Extinguisher Test 11/22 33 CFR 154.735 (d) PDF
Intrinsically Safe Radio 2016 33 CFR 154.735 (q) PDF
Petroleum Crude Oil CHRIS Manual Code / OIL 06/1999 USCG CHRIS Manual PDF
Petroleum Crude Oil SDS 04/14 EnLink SDS PDF

This records page is maintained by BSI Corp. Inquiries or navigation problems should be directed to Marty Hooks at [email protected].

EnLink Bells Run Home Page

Copyright © BSI Corp - Website Development AlpineWeb Design