Vapor Control System
Equipment Requirements
Component | Last Test Date | Next Test Date | Frequency | Requirement | Documentation |
VCS Piping & Vapor Hoses Pneumatic testing Procedures | 08/05/21
08/05/22 |
08/05/22
08/05/23 |
Annually | 33 CFR 156.170 (g)(1) | 2021 PDF |
Vapor Equipment | 03/23 | 03/24 | Annually | 33 CFR 156.170 (g)(1) | |
Relief Valves | 03/22 | 03/23 | Annually | 33 CFR 156.170 (g)(1) | Page |
Detonation Arrester | 06/28/23 | 06/28/24 | Annually | 33 CFR 156.170 (g)(3) | |
Oxygen Analyzer | Last Transfer | Next Transfer | Each Transfer | 33 CFR 156.170 (g)(4) |
General Records
Type of Record | Effective Date | Requirement | Documentation |
Vapor Repair Log | January 1, 2000 to Current | 33 CFR 154.740 (g) | Page |
Vapor Control System Automatic Shutdown Log | January 1, 2003 to Current | 33 CFR 154.740 (g) | Page |
VCS Re-Certification Letter / Warner Nicholson Engineering | July 18, 2018 | 33 CFR Subpart P | |
VCS Re-Certification Letter / Warner Nicholson Engineering Tandem Loading Authorization | October 5, 2018 | 33 CFR Subpart P | |
USCG Tandem Loading Authorization Sheet | October 27, 2020 | 33 CFR Subpart P | |
USCG Letter of Adequacy Endorsement | October 27, 1994 | 33 CFR 154 |